Authority Desk

Contact Kleemann Crushing Specialists

Share feed size, target t/h and rock type — the engineering desk routes your brief to crushing specialists, not a generic inbox. Layout keeps map and hours visible beside the form.

Field-service Hotline

Dispatch for contracted crushing plants · target < 16h MTTR on quarry-belt sites

+1-800-555-5363

Engineering Team

Capacity curves, screen mesh tables, plant layouts · reply within one business day

[email protected]

Spare Parts Hub

18 regional warehouses · manganese liners, bearings, screen cloth

Lookup a Part

Visit & Correspondence

Equipment managers and chief engineers should include feed size (mm), target output capacity (t/h), rock UCS band, moisture and preferred primary technology (jaw or impact). Incomplete briefs still receive a reply, but capacity-curve matching takes longer without those five fields.

  • AddressHaus Kleemann, Emsstr. 5–6, 26548 Norderney reference desk / US ops: 2100 Aggregate Blvd, Suite 300, Dallas, TX 75201, USA
  • Email[email protected]
  • Phone+1-800-555-5363
  • Desk hoursMon–Fri 07:00–18:00 CT · emergency dispatch 24/7
  • SocialLinkedIn · YouTube · technical briefings

What happens after you submit

  • Within one business day a crushing applications engineer acknowledges the inquiry and flags missing feed or gradation data.
  • For contracted quarry-belt sites, field dispatch targets under sixteen hours MTTR when wear parts are pre-staged for your jaw opening class.
  • Non-standard wet screening or high-UCS granite circuits may require a follow-up call before a firm plant string is issued.
Map illustration of Kleemann crushing engineering desk

Send Specs to Our Field Team

Authority split keeps the information column on the left and the inquiry form on the right. The modal inquiry remains a compact dialog only — this page is the full contact experience with map, hours and routing notes. Responses are engineering-led, not automated marketing sequences.

Scope limits: we quote crushing and screening plants and related wear parts. Requests for excavators, cranes or paving fleets are redirected. Lead times stated on the site are ex-works planning ranges and change when ocean freight or foundation drawings are incomplete.